Skip to product information
1 of 11

ExtraShop

Food Processor & Vegetable Chopper, 15L Food-Grade Stainless Steel Food Processor Chopper with 2 Extra S-Curve Blades, Ideal for Chopping Vegetables, Fruit, Grains, Nuts

Food Processor & Vegetable Chopper, 15L Food-Grade Stainless Steel Food Processor Chopper with 2 Extra S-Curve Blades, Ideal for Chopping Vegetables, Fruit, Grains, Nuts

Regular price €629,95 EUR
Regular price Sale price €629,95 EUR
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
Features & Details
  • Commercial Food Processor: This commercial food processor features sharp S-shaped blades made from 420J2 stainless steel and includes two blades for convenience. Perfect for chopping various ingredients, including vegetables and fruits.
  • One-Button Quick Chopping: Equipped with a 1400W motor and an average speed of 1400 RPM, this food processor and vegetable chopper effortlessly handles ingredients of varying textures with a single push of the start button. It speeds up prep time significantly.
  • Large Capacity: With a 15L (15.9 qt) chopping bucket, this electric food processor is ideal for both large and small batch processing, meeting a variety of preparation needs.
  • Food-Grade Material: All parts in contact with food are made from food-grade stainless steel. The blades and accessories are detachable and dishwasher safe, making cleanup hassle-free.
  • Wide Application: Compact and sleek, this food processor chopper fits easily in any kitchen space, making it ideal for use in hotels, salad bars, snack shops, and restaurant kitchens.
Product Specification
  • Blade Material: 420J2
  • Speed: 1400 RPM
  • Capacity: 15.9 QT / 15 L
  • Noise: ≤ 75 db
  • Chopping Bucket Material: 304 Stainless Steel
  • Item Model Number: SC-7315
  • Main Body Shell Material: 201 Stainless Steel
  • Net Weight: 75 lbs / 34.0 kg
  • Power: 1400W
  • Product Size: 15.7 x 15.9 x 24 inches / 400 x 405 x 610 mm
View full details